PRELIMINARY STAGE
- Feasibility studies
- Critical issues assessments and identification of alternative solutions
DESIGN STAGE
- Preliminary, final and detailed design
- Geotechnical consulting to structural designer
- Geotechnical investigations design and assistance and site characterization of soil and rock
- Monitoring system design
- Drawing up of the technical documentation and measurements for rehabilitation works of the architectural structures bound by Superintendence
- Drawing up of the security plan (D.Lgs. 81/2008)
TENDER STAGE
- Assistance to companies during the tender phase for their technical and economical offers
- Technical assistance to the technical director of the project
CONSTRUCTION STAGE
- Construction management
- Technical assistance to construction management or companies for geotechnical and civil works
- Project variance analysis
- Detailed construction design
- Monitoring system control and data intepretation
- Works accounting
- Safety and security management (D.Lgs. 81/2008)
- Final approval works