PONT VENTOUX HYDROELECTRIC POWER PLANT

FINAL TEST CERTIFICATES OF THE UNDERGROUND POWERHOUSE AND PRESSURE TUNNELS

 

0 Opera 07 CENTRALE IN CAVERNA 3 Opera 03 VASCA CLAREA 2 Opera 07 CENTRALE IN CAVERNA 5 Opera 03 VASCA CLAREA 1 Opera 07 CENTRALE IN CAVERNA 6 Opera 03 VASCA CLAREA 4 Opera 03 VASCA CLAREA 8 Opera 10 GALLERIA RESTITUZIONE 7 Opera 06 CONDOTTA FORZATA 10 Opera 10 GALLERIA RESTITUZIONE 9 Opera 10 GALLERIA RESTITUZIONE 12 DSC02808 11 DSC02786 14 DSC04995 13 DSC02813

DESCRIPTION

Description currently not available

INFORMATIONS

Site: Susa (To)
Client: AEM Torino
Date: 1997÷2007
Services: Inspection
Sector: Geotechnics, Hydraulic
Project value: